Thanks to your continued support, we are now up to $86,411 out of our $300,000 goal as of 4/8/26. That milestone is no small feat and is truly a testament to the passion of this community! We are deeply grateful to everyone who has donated, shared their personal stories connected to the engine, or expressed excitement about seeing this historic locomotive operate again later this year.
Even though the finish line is in sight, we must reach our full $300,000 goal in order to bring Chicago and North Western #1385 back into service in 2026. If we’re not able to raise these funds, progress will unfortunately have to slow down, meaning we won’t be able to operate this year.
This restoration has already delivered an unforgettable moment. As some of you know, on December 5th, 2025, #1385’s whistle echoed across North Freedom, Wisconsin for the first time in nearly 30 years. Watching her steam beneath the water tower once again was nothing short of magical. A true glimpse of history re-awakening.
We are closer than ever to completing this restoration and sharing #1385 with everyone who loves her. This project has always been about honoring memories, the love of the machinery, and ensuring that future generations can experience the power, sound, and spirit of this remarkable, 1907 built locomotive.
We humbly ask you to be part of the final push. Your donation will help complete the remaining work needed to return #1385 to operation in 2026. Below, you’ll find details on what your support will fund, along with a few ways to contribute. As always, thank you for your continued support and your consideration. Please stay tuned next week for more #1385 updates!
What your support will help finish:
• Large items: Purchase and install boiler insulation and fabricate new boiler jacketing Build patterns and have new arch brick manufactured for inside firebox Repair drawbar, buffer, and safety chains Manufacture new pistons, piston rings, and rod packing Install pistons, piston heads, and packing Manufacture new valve gear blades Install valve gear and blades Manufacture new piston valve rings Set valve gear timing of engine Support the cost of fuel, lubricants, and supplies for break-in runs Support labor and materials to apply final paint and lettering to the locomotive
• Medium and small items Finish manufacturing and installation of front-end arrangement Manufacture and install airtight casings around branch pipes Machining, fitting and installation of crossheads, crosshead guides and crosshead slippers Finish fit-up and installation of air and steam piping on engine and tender Finish electrical wiring Repair to bell, yoke, and ringer Purchase, manufacture and install numerous fit and finish items Support contract work for specialized jobs
• Donate online using the button below
• Donate by phone through our museum’s office: 608-522-4261
• Mail your donation: Mid-Continent Railway Museum, P.O. Box 358, North Freedom, WI 53951 (Write “#1385 Fund” in the memo line.)
To help Mid-Continent restore the DULUTH to its former glory, please consider making a donation to the DSS&A Sleeper DULUTH Fund. Donating is tax-deductible and easy to do. You can make your donation via mail or donate online using the donate button below.
If you choose to donate by mail, please be sure to write in “DSS&A Sleeper DULUTH Fund” on the printable donation form or check memo line. Credit/debit card donations can also be accepted via phone at 608-522-4261 or 800-930-1385 by speaking to our staff during administrative office hours Monday-Friday.
We’re extremely close to hearing Chicago and North Western #1385’s whistle reverberate through the Baraboo hills once again, but we need your help to cross the finish line!
▫ The Goal: We’re pushing for steam operation in 2026, and we can’t get there without YOU. $300,000 is needed to complete the mechanical restoration of our 1907 built, #1385. This restoration has been over 13 years in the making, and we are beyond excited to bring steam back to North Freedom, Wisconsin!
▫ What the $300,000 will be used for:
Large items: – Finish pistons, rings, and rod packing. – New drawbar. – Jacketing and insulation.
Medium and small items in no particular order: – Machining, fitting and installation of crossheads. – Finish fitting and installation of air and steam piping on engine and tender. – Finish electrical wiring. – Valve gear installation and timing. – Numerous fit and finish items. – Contract work for specialized jobs.
▫ Where To See Updates: We’ll be posting a fundraiser update every Wednesday to our Facebook and Instagram. In addition, we’ll be updating a physical thermometer in our ticket depot and engine house for live updates! Please stay tuned!
Every donation, no matter the size, brings us closer. Donate today and help us spread the word by telling your friends and giving this post a share. Let’s steam into 2026, together! 🚂
You can also make a donation by phone at 608-522-4261 or mail to: Mid-Continent Railway Museum P.O. Box 358 North Freedom, WI 53951 (If donating with a check, please write ‘#1385 Fund’ in the memo line.)
Chicago and North Western #1385 basking under the sun on September 1st, 2025. MCRM photo.
The 5-day long “All Hands on Deck” session held on June 18th-22nd by the MCRM Restoration Department was a great success. The very successful and productive “All Hands on Deck” Session had a total of 32 volunteers participating in the event, with an average of 20 volunteers per day. In total the volunteers put in over 800 hours of work during this session. The volunteers really did an outstanding job and performed an immense amount of work in a matter of a few days.
Anyone visiting the MCRM Car Shop after this event will notice a significant difference in the appearance of the cars that were worked on. The progress made during this session exceeded the expectations. The progress made was achieved due to the support, commitment and hard work of the volunteers. Progress made during the 5-day All Hands on Deck Session is summarized below. Note that several of the photos capture the status of the projects before and after the All Hands on Deck session. East Jordan & Southern Combine #2: The volunteer crew of Pete, Jeff Hu., Jeff A., Jeff Ha and Dean S. assembled and installed the Buntin seat frames, seat back and seat bottoms for the seats in the passenger section. This included boring the holes in the truss plank for the foot rests and installing the arm rests on the aisle castings. The crew also installed the second overhead oil lamp in the passenger section as well as the oil bracket lamp adjacent to the saloon. With work wrapping up in the passenger section additional work was performed in the baggage compartment.
BEFORE: The EJ&S #2 as Dean S., Jeff Hu and Jeff A. work on installing brackets on the ends of the seat backs.
Pete, Jeff A. and Jeff Hu installing the seat brackets on the east side of the car.
The new seats and cushions installed on the east side of the car.
AFTER: The EJ&S after three days of work to install the new seats. The newly installed seats on the left are covered with sheets.
Duluth South Shore & Atlantic Sleeping car DULUTH: The volunteer crew of Karl, Bob B., Ron, John, Dean V., Nate, Andrew, Tom, Jack, Jerry F. and Bill worked on the DULUTH during the AHOD session. During the session we took delivery of six new berth tables, six folding window screen frames, the sleeping compartment window panels and trim pieces for the smoking room. Work performed included installing trim pieces, headliner battens and a window bottom rail in the smoking room. In the sleeping compartment the new window post panels were trimmed, fit and installed along with the berth partition overlay pieces. The accomplishments in the sleeping compartment are significant as they will allow us to move on to installing the heating pipes and lower berths.
On the exterior of the car over 15 feet of the car received new car siding on the area below the windowsill. Another significant accomplishment was the installation of the new 8-piece windowsill for the east side. Each piece of the windowsill was doweled and screwed together to make for a one-piece sill 65 feet in length. Once assembled the windowsill was lifted into place with the help of ten volunteers evenly spread out across the length of the sill. Once in place the windowsill was screwed in place and the screw holes were plugged.
BEFORE: The sleeping compartment prior to the AHOD.
Part of the crew in the DULUTH. Dean V., Ron, Steve, Bob and Karl.
Ron in the process of install one of the berth partitions.
AFTER: The sleeping compartment after the AHOD.
Karl and John installing new lower siding on the DULUTH.
Volunteers in the process of installing the one-piece windowsill into place on the DULUTH.
Soo Line Caboose #99085: The volunteer crew of Richard P., Larry S., Bob R., David P., Dean S., Dean V., Jeff Hu., Altha, Jack, Jerry F., Gregg, Jane and Bill worked on the caboose during the AHOD session. Work performed included installing the new car siding on the east side of the car and framing out all four of the windows on the car. On the west side of the car new siding was installed around SW window and the bottom six inches of a number of boards were cut off and replaced. Epoxy repairs were made as needed on the car sides and the end beams. The entire car body was sanded, and all bare wood was primed. With the exception of a few areas awaiting further repairs, the entire car received two coats of the caboose red.
The new window frames for the car body and cupola were primed and given two coats of finish color. New wood roof drip edge pieces were made and are waiting to be installed along with the new rubber roof.
BEFORE: Jack and Jerry installing the new car siding on the east side of the caboose.
Work in process on the west side of the caboose.
AFTER: The caboose after five days of work.
Chicago & Illinois Midland Business Car #90: The volunteer crew of Steve, Dean V. and Jerry M. worked on the C&IM #90 business car. Work continued to route and install new wiring for the light fixtures in the south end of the car. The light in the toilet room has been energized and shortly power to the south entranceway and rear vestibule will be completed. In the south stateroom good progress was made with replicating the wardrobe. Final fitting of the door to the door frame was performed and the material for the wardrobe side and bottom were cut to size. All pieces of the wardrobe were sanded and the interior surfaces were sealed and stained.
Steve working on the wiring inside the C&IM #90.
Jerry M. and Dean V. staining the side panel for the wardrobe in the C&IM #90.
Rock Island Combine #1094: Fred B. And David M. braved the sun and heat to work on needle scaling the east side of the car. The process has them getting down to bare metal and removing all of the rust. Good progress was made as over 60% of the east side of the car has been needle scaled, wire brushed and primed.
Fred and Dave M. working on the CR&IP #1094.
Lake Superior & Ishpeming coach #64: Bob and Larry worked inside the #64 coach. Two new end doors were received as well as a new panel for the smoking room wall. The wood panel for the smoking room was installed while the end doors wait to be fitted to the car. Inside the car stripping and sanding the car continued on the south end of the car.
The new middle panel in LS&I #64 smoking room.
The new oak end doors for the LS&I #64.
“I’d like to thank all of the amazing volunteers who put in a tremendous amount of work during the past 5 days! Your collective efforts were amazing and a real morale booster to the restoration efforts at Mid-Continent. I’d also like to extend a special thanks to the volunteers that prepared all of the meals for the entire crew during the session.” – Bill, Restoration Dept. Manager
Some of the AHOD volunteers that were on hand during the session.
Steve serving up lunch time for the AHOD volunteers.
Mid-Continent Railway MuseumPosted on by Jeffrey Lentz
Thank you to those who participated in the C&NW #1385 Cab Experience silent auction at the 1385’s Homecoming Celebration event. The winning bid from a Baraboo resident came in at $1,005.00. The winner will enjoy the opportunity to join the crew in the 1385’s cab during a future run of the locomotive.
Contains information related to marketing campaigns of the user. These are shared with Google AdWords / Google Ads when the Google Ads and Google Analytics accounts are linked together.
90 days
__utma
ID used to identify users and sessions
2 years after last activity
__utmt
Used to monitor number of Google Analytics server requests
10 minutes
__utmb
Used to distinguish new sessions and visits. This cookie is set when the GA.js javascript library is loaded and there is no existing __utmb cookie. The cookie is updated every time data is sent to the Google Analytics server.
30 minutes after last activity
__utmc
Used only with old Urchin versions of Google Analytics and not with GA.js. Was used to distinguish between new sessions and visits at the end of a session.
End of session (browser)
__utmz
Contains information about the traffic source or campaign that directed user to the website. The cookie is set when the GA.js javascript is loaded and updated when data is sent to the Google Anaytics server
6 months after last activity
__utmv
Contains custom information set by the web developer via the _setCustomVar method in Google Analytics. This cookie is updated every time new data is sent to the Google Analytics server.
2 years after last activity
__utmx
Used to determine whether a user is included in an A / B or Multivariate test.
18 months
_ga
ID used to identify users
2 years
_gali
Used by Google Analytics to determine which links on a page are being clicked
30 seconds
_ga_
ID used to identify users
2 years
_gid
ID used to identify users for 24 hours after last activity
24 hours
_gat
Used to monitor number of Google Analytics server requests when using Google Tag Manager