↓
 

Mid-Continent Railway Museum

North Freedom, Wis.

Text: Mid-Continent Railway Museum. A historical and educational experience. Images of railway cars, people, and Mid-Continent logo.
  • Home
    • Home Page
    • News
    • Join Our Email List
    • Media
  • Plan Your Visit
    • Buy Tickets
    • Train Ride/Museum Info
    • Special Events
      • Root Beer Float Flyer
      • Vintage Rail Car Tours
      • Autumn Color™ Weekend
      • Harvest Flyer
      • Pumpkin Special™
      • Halloween Flyer
      • Santa Express™/Holiday Flyer
    • Cancellation Policy
  • Restorations
    • Major Projects
    • Steam Status
      • Overview
      • C&NW #1385 Status Updates
      • Western Coal & Coke #1 Status Updates
      • Dardanelle & Russellville #9 Status Updates
    • Car Shop
      • General Updates
      • DSS&A Sleeper DULUTH
      • EJ&S #2
      • Badger #2
      • Copper Range #25
      • MLS&W #63
      • Copper Range #60
  • Equipment Roster
    • Equipment Roster Home
    • Steam Locomotives
    • Diesel/Other Locomotives
    • Wooden Passenger Cars
    • Steel Passenger Cars
    • Wooden Freight Cars
    • Steel Freight Cars
    • Cabooses
    • Service Equipment
    • Former Collection Items
  • Resources
    • Online Archives Home
    • Wooden Car Builders
    • MCRM Newsletters
    • Gazette Archive
    • Audio Archive
    • Video Archive
    • Wallpaper
    • Kids Page
      • Kids Page
      • What Makes A Diesel Locomotive Work?
      • What Makes A Steam Locomotive Work?
  • About Us
    • Contact Us
    • About Mid-Continent
    • Board of Directors
    • Department Leaders
    • Our Staff
    • Become a Member
    • Volunteer
    • Employment
    • Tour of Grounds
    • Local History
    • Mid-Continent Timeline
    • Policies
      • Privacy Policy
      • Non-Discrimination Policy
  • Donate

Category Archives: C&NW #1385 Status Updates

Welcome to the Chicago & North Western #1385 steam status blog! Follow along as we bring the 1907 American Locomotive Company 4-6-0 steam engine back to operating condition.

Post navigation

← Older posts
Newer posts →

1385 Update: Branch Pipe Donuts and Grate Bearers

Mid-Continent Railway Museum Posted on July 16, 2021 by Jeffrey LentzJuly 16, 2021

Branch Pipes Follow-Up

In our January 2021 Update, it was discussed that one of the upcoming tasks was to create “donuts” to insert between the branch pipe and steam chest and between the branch pipe and superheater header. That task has now been completed.

These spacer donuts are needed to adjust for minor manufacturing size differences and space variations between the new and old components. The donuts needed to each be custom made to be steam tight and to properly position on both ends of the branch pipes.

  • Detail view of lower end of 1385’s fireman-side branch pipe with “donut” extender.
  • Another detail view of the lower end of 1385’s fireman-side branch pipe with “donut” extender.
  • Top of C&NW #1385 branch pipe (black) on fireman side. A “donut” is being created to permit a steam-tight seal between the branch pipe and superheater header.
  • Top of C&NW #1385 branch pipe (black) on engineer side. This side will also be receiving a “donut” to close the gap to create a steam-tight seal between the branch pipe and superheater header.
“Donuts” installed at the bottom of C&NW #1385’s branch pipes to fit the pipes to the steam chests.

Reconstructing the Grate Bearers

If you have a home fireplace, you know that you don’t place logs directly onto the floor of the fireplace when burning. For better combustion, the logs are usually placed on a metal grate which props the logs up and allows air to more easily flow underneath the logs and helps feed the fire with more oxygen, allowing it to burn hotter. This same concept applies when firing a steam locomotive – the grates on a locomotive are just larger and more complex, allowing the fire to be manipulated by the locomotive’s fireman.

The grates are rectangular cast iron pieces with many holes through them that form the floor of the firebox.  That cast iron floor holds the coal as it burns so the locomotive can generate the heat needed to boil the water for steam. 

As you look in from the firedoor there are two rows of grates that run from the front of the firebox to the back.  Each row of grates is about half the width of the firebox so the dividing line (front to back) is the centerline of the firebox

The grates are set on – and held in place by – the grate bearers.  The grate bearers were originally cast iron brackets with a row of pegs to hold the end of each grate.  There is a row of pegs that runs down each side of the firebox, front-to-back, and then in the center there is a bridge that runs front-to-back with pegs on each side to hold the inside end of both rows of grates.

Chicago & North Western drawing from the 1920s recommending to weld the grate bearers in place.

In the mid-1920s the grates were somewhat redesigned and in the later 1920s the Chicago & North Western’s repair procedures documented on the drawings said to weld the new pieces in place. During this locomotive rebuild, Mid-Continent is doing the C&NW one better and is making the new bearers an all-welded assembly.  As can be seen in the photos the old bearers have been eaten away by the very corrosive nature of the ash and repaired by weld.

  • Close-up view of one of the old grate bearers. An old weld repair is evident.
  • Portions of the old grate bearers have been eaten away by years of service inside the harsh and corrosive environment of the firebox.

In these photos, the web portion of the new side bearers have been machined and are ready to accept the pegs that will be welded in place to hold the grates and lay beside the originals they will replace.

  • Comparison of one of the old and mostly-complete new lower side grate bearers.
  • Another view comparing the two mostly-complete new grate side bars versus the old side bar.
  • Comparison of the two mostly-complete new grate side bars versus the old side bar. A Chicago & North Western Railway drawing dated August 26, 1932 with detailed dimensions is seen in the background.

The old center support is not in horrible shape but has been modified and repaired over the years. The main web of the new center support has been tacked together to allow for fitting into the firebox.  Once it had been trimmed to the proper length and height the pegs will be welded in, a plate along the bottom edge will be welded on and the bridge support pieces will be added to make a complete assembly.

This is the old center support grate bearer. Over the years it was repaired and modified from the original design specifications.
  • A photo from the 1990s showing the interior of 1385’s firebox with center grate bearer. The grates from the near (engineer) side have been removed and placed atop the grates on the fireman side.
  • Current view of the center grate bearer being test-fitted inside the firebox. This view is looking toward the rear of the firebox. The circular cut-out is for the firedoor where coal will be shoveled into the locomotive.
  • View inside C&NW #1385’s firebox looking in the direction of the rear tube sheet. Photo taken in the 1990s.
  • Current view looking toward the rear tube sheet and front-left corner of the firebox. The center grate bearer which runs lengthwise down the center of the firebox is shown being test-fit prior to permanent installation.
A 1990s picture inside C&NW #1385’s firebox provides a detail view of the grates. The grates on the engineer side have been lifted off the grate bearer pegs and placed atop the fireman side grates. Below the center grate bearer can be seen the grate shaker mechanism that allows the fireman to pivot the grates to adjust airflow or dump the fire.

No Minor Detail

Mid-Continent Railway Museum Posted on March 26, 2021 by Jeffrey LentzMarch 25, 2021

When it comes to the proper operation of a steam locomotive there is no minor detail.  Every piece must perform properly.  That extends all the way to the clips or “dogs” that hold the door shut on the front of the smokebox.  You may ask why and I hope to explain. 

C&NW #1385 at Mid-Continent Railway Museum. Enlarged detail of door dogs.

First and foremost to work efficiently a locomotive must generate steam well and in great quantity. One of the factors that figure heavily is how much air is drawn through the fire to ensure plenty of oxygen to support the combustion of the fuel.  That air is drawn by the creation of a partial vacuum in the smokebox of the engine.  That partial vacuum is created by directing the exhaust steam from the cylinders up through the exhaust nozzle and into the petticoat pipe at the base of the smokestack.  The exhaust is moving at a very high speed and because there is an open space between the nozzle and petticoat and due to the shape of both devices it will pull some of the gases in the smokebox along with it up and out the stack. 

simplified illustration of steam locomotive smokebox and placement of door dogs
Simplified illustration of a traditional steam locomotive smokebox, showing creating of draft and placement of door dogs.

Mother Nature is always following the path of least resistance so if there is a vacuum leak around the smokebox door air will be drawn in from there first rather than the more difficult path of up through the fire bed and down the tubes & flues to the smokebox.  If there is a leak at the door the engine will not steam well and efficiency suffers.  This is why the door dogs are important in that they must clamp the door down evenly on the gasket all the way around the edge in order to get a good vacuum seal.  Having the dogs a uniform size & shape makes it easier to judge when each has been properly tightened down.

The door dogs removed from C&NW #1385 were a mix of original castings, castings salvaged from other locomotives, and simple angle irons used in the place of missing castings.
  • Source material for a new door dog.
  • Partially completed door dog.
  • Partially completed door dog.
  • Completed door dog.
  • Completed door dog.
Newly created door dog next to versions removed from the C&NW #1385.

Tagged smokebox

C&NW #1385 Update – January 2021

Mid-Continent Railway Museum Posted on February 1, 2021 by Jeffrey LentzFebruary 4, 2021

With January coming to a close it is time to check in again with Chicago & North Western #1385’s progress. Steve Pahl, MCRM General Foreman of Steam, provided the following list of work being performed or recently completed as of January 20, 2021.

Key areas of work on C&NW #1385 during January 2021.

  1. The auxiliary steam dome is currently being repaired. The auxiliary steam dome is where the safety valves, boiler vent valve, and whistle are mounted. The boiler vent valve is used for filling the boiler with water and serves as a vent when draining said boiler. The whistle, of course, is the epitome of steam railroading! 
  2. The cast iron blanks for the new piston bull rings have been water jet cut to rough dimensions and are ready to be machined to the final dimension with grooves cut for the piston rings. The center “donut hole” left over after the piston bull rings were cut out are being used as the blanks for the two smaller bull rings that are needed for each valve. That way there is not nearly as much waste in material lost.
    Two cast iron blanks which will become C&NW #1385’s piston and valve bull rings. M.L. Deets photo.
    This photo from February 2017 shows 1385’s disassembled piston. One of the bull rings is circled. M.L. Deets photo.

    One of the cast iron “blanks” for the new piston bull rings, shown after being water jet cut to rough dimensions. Further machining is required. Steve Pahl photo.

  3. A valve cage is a hollow cylindrical wear element that is used as both a guide for the valve as well as the outer sealing surface for the valve so it can route both the live steam and exhaust steam to the proper places. The valve packing rings form the inner sealing surface and slide back-and-forth in the valve cage as the valve is moved.

    C&NW 1385’s new valve cages stand ready to be installed into the steam chests. Steve Pahl photo.

    There are two sets of ports that have been machined into each cage. The large rectangular ports lead to the exhaust nozzle up to the smokebox so the exhaust can be pointed up and out of the smokestack. The smaller parallelogram-shaped ports lead to the passage to the cylinder. Depending on the position of the piston valve inside the cage either the live superheated steam is routed into the cylinder to push the piston forward or back or the cylinder is connected to the exhaust passage to release the steam once it has done the work of pushing the piston. Since steam pushes the piston in both directions there are ports needed for each end of the piston travel and the need for a cage at each end of the steam chest.

    Another view of the new valve cage. Steve Pahl photo.
    Comparison view of the old damaged valve cage that is being replaced. Jeffrey Lentz photo.

    The valve cage on the locomotive’s engineer side has been previously cleaned up by boring and was found to be thick enough to still have a long service life ahead and was therefore left in place. The fireman’s side valve cage was found to be in need of replacement. The new fireman’s side valve cages are now ready to be installed into the steam chest. This will be an interesting process to install. The valve cages will be shrunk using dry ice. In the meantime, a couple of rosebud oxy/acetylene torches will be used to expand the steam chest and if everything goes correctly, the valve cage should slide right in. One cage will be inserted from the front side of the steam chest while the other will be inserted from the rear.

    Looking into the fireman’s side steam chest where the new valve cages will be inserted. M.L. Deets photo
    This broader view shows the engineer’s side of C&NW 1385. Unlike the fireman side, the valve cage (circled) on the engineer side was left in place after boring. M.L. Deets photo.

  4. Fire doors have been painted and await installation. A “spacing” ring needs to be fabricated that will fit between the boiler and the firedoor itself. This is necessary for operational clearance. Due to the change from threaded and peened staybolts to the now welded staybolts, which was by design of the new boiler.
  5. As mentioned in the December update, the air compressors are awaiting installation. With the new boiler design, there needs to be adjustments made to the mounting brackets and boiler studs to ensure the proper placement as it appeared when MCRM purchased the locomotive. This will also be necessary for the power reverse due to the same circumstance.
  6. SPEC Machines made a tool for resurfacing and lapping the seats and flanges on the steam delivery pipes, the superheater header, and the steam chests. This ensures a tight seal for delivering the superheated steam from the superheater header to the steam chests. Work on these existing sealing surfaces is now complete. Yet-to-be-made matching “donuts” will be inserted between the branch pipe and steam chest flanges and the branch pipe and superheater header to adjust for minor manufacturing size differences and space variations between the new and old components.
    Flange atop one of 1385’s steam chests showing the new seat surface that has been cut. Tyler Roudebush photo.
    Flange atop the other of 1385’s steam chests. Tyler Roudebush photo.

    Newly machined sealing surface at the bottom end of the branch pipes. These carry the steam from the superheater header to the steam chests. Tyler Roudebush photo.
    Top end of the 1385 branch pipes with newly machined sealing surface. Tyler Roudebush photo.

  7. The smoke box has been seal welded to the boiler. This procedure finally secures the smoke box to the boiler itself. As reported last month, SPEC Machine was busy drilling and reaming the holes that connect the smoke box to the cylinder saddle. I am happy to report that the smoke box is in fact bolted down to the cylinder saddle with 50 tapered fitting bolts custom made by SPEC Machines with 50 H2 heavy nuts.  The boiler is now officially attached to the frame!  There is still some work to be completed with the smoke box; i.e., complete the grouting at the bottom of the smoke box with refractory, install smoke stack and assorted draft appliances.

50 custom-made tapered bolts now help secure the smoke box to the cylinder saddle. Steve Pahl photo.

Outside view of bolts securing the smoke box to the cylinder saddle. M.L. Deets photo.
Detail view of the seal weld and bolts along the bottom of C&NW 1385’s smoke box. M.L. Deets photo.

Detail view of the seal weld and bolts along the bottom of C&NW 1385’s smoke box. M.L. Deets photo.

Tagged smokebox

You Can Help Get C&NW 1385 Back in Service

Mid-Continent Railway Museum Posted on January 31, 2021 by Jeffrey LentzFebruary 1, 2021

Ever since the C&NW No. 1385 restoration was resumed in 2011 work has progressed steadily thanks in large part to the financial support of the 1385 project’s enthusiastic followers. That financial backing has allowed hired professional machinists to work on the project 5-days-a-week and allowed progress to occur much faster than could be accomplished by volunteers alone.

As we head in the home stretch we’re asking for your continued support so that the 1385 restoration can continue moving forward without delay. Please consider joining the growing list of nearly 1,000 project contributors by donating today. You can do so by visiting our Donation Page and specifying in the donation form that you want your contribution to support C&NW #1385.

Donating is easy thanks to our online donation form which accepts all major credit cards and Paypal, or you can use our printable donation form to send with your mailed contribution. Thank you for helping us get this far!

With your help this will soon be a common scene at Mid-Continent Railway Museum.

1385 Update: December 2020

Mid-Continent Railway Museum Posted on January 4, 2021 by Jeffrey LentzJanuary 29, 2021

In the second half of December, Steve Pahl, Sr., Mid-Continent’s General Foreman of Steam Power took photos of 1385 at SPEC Machine and reported the following recent progress and items coming up in the immediate future.

Work Areas (correspond to numbers in the below list).

  1. The saddle bolt holes have been drilled and are in the process of being reamed. The saddle bolts still need to be produced.
  2. Pistons and rods have been returned with the piston rod and re-trued (cut on a lathe). The pistons themselves are ready to be reassembled.
  3. The valve slides should be ready for heat-treating in January 2021.
  4. The crosshead slide drawings are complete and are awaiting machine time.
  5. The furnace bearers along with all components are fitted and ready for final securement after the smokebox is secured to the saddle.
  6. The two 9-1/2″ air compressors shown being test in the previous 1385 will soon be mounted in their rightful location on the fireman side of the locomotive.
  7. The firedoors will be painted by early January in preparation for installation on the backhead.
  8. Superheaters have been installed and preliminary testing is completed. They still need to pass final hydro testing.
  9. SPEC Machine hopes to have the smokebox completed by the end of January 2021, in as far as it will be:
    1. Secured to the saddle with bolts.
    2. Grouted (to fill the voids between the cylinder saddle and smokebox and help make the two pieces become one)
    3. Have the smokestack installed
    4. And have the draft appliances installed, including the petticoat pipe, spark arrester, and associated components. 

Saddle bolt holes have been drilled in preparation of final securement of the firebox and boiler to the saddle. View is looking up at the ceiling from the cylinders. S. Pahl photo
1385’s piston rods have been re-trued and ground to a finish. S. Pahl photo.

Furnace bearers and related components are fitted and ready for final securement of the boiler. These bearers allow the boiler to expand and contract while still being supported by the locomotive frame. S. Pahl photo.
Another view of the furnace bearers. S. Pahl photo.

View inside the smokebox of the saddle bolt holes (holes in the floor of smokebox). S. Pahl photo.
Reaming is underway by SPEC Machine. S. Pahl photo.

The saddle bolts will be inserted through the holes to secure the boiler to the saddle and locomotive frame. This is the only point where the boiler is solidly affixed to the frame. S. Pahl photo.

Post navigation

← Older posts
Newer posts →
QUICK LINKS
PLAN YOUR VISIT
BUY TICKETS
DONATE
JOIN OUR EMAIL LIST
VIEW WEBCAMS

Contact Us

Mid-Continent Railway Museum
P.O. Box 358
E8948 Museum Road
North Freedom, WI 53951
Office Phone: 608-522-4261
or 800-930-1385
Office Hours: Tuesday-Sunday
9:30am-5:00pm
E-mail: inquiries@midcontinent.org

Recent News

  • Help Keep #1385’s Legacy On Track – Update
  • Dardanelle & Russellville #9 – March 21, 2026, Work Session Update
  • Help Keep #1385’s Legacy On Track!
  • Montana Western #31 and DULUTH Sleeper Car $10,000 Donation Challenges MATCHED
  • 2025 DULUTH Progress Report
©2026 - Mid-Continent Railway Museum - Weaver Xtreme Theme Privacy Policy
↑